dsc_1303.jpeg

Test application on SBB network in Gland, 9/10 September 2026

The first Absolutely Better Joint (ABJ_018) was installed in Gland, Switzerland, on the night 9/10 September 2026

The line Geneve-Lausanne in characterized by an intense mixed  passenger/freight traffic (70.000 t/day) at a maximum speed of 160 km/h. This page shows some images of the installation (night 9/10 September) and some views of the installed joint under the trains passing in Gland on 10 September 2026 morning.

Further applications are on the way (expected beginning of October 2026).

Please follow us for updateds and feel free to contact us for any information you may need.

You may find our contacts in the home page.

dsc_1303.jpeg20260910_003256.jpegimg_8299.jpegimg_8337.jpeg20260910_001210.jpeg20260910_004409.jpegimg_8318.jpegdsc_1339.jpegdsc_1305.jpeg20260910_003503.jpeg20260910_020620.jpeg20260910_011550.jpegdsc_1345.jpeg20260910_004039.jpeg20260910_004525.jpegimg_8280.jpeg20260910_000544.jpegdsc_1303.jpegdsc_1320.jpeg20260910_003822.jpeg20260910_015125.jpegdsc_1319.jpegdsc_1304.jpegdsc_1322.jpegdsc_1350.jpegimg_8283.jpegdsc_1344.jpegimg_8351.jpeg20260910_003311.jpegimg_8294.jpeg20260910_015443.jpeg20260910_004031.jpeg

Copyright Andrea Bracciali 2026